Leg 3 is changing for 2024:
- A new suspension bridge across the river should be completed by September. This will move use away from the traffic bridge (near NBC).
GPX files (updated 06-JAN-24)
- 100mi gpx file (or load via Garmin Connect)
- 50mi gpx file (or load via Garmin Connect)
- 50km gpx file (or load via Garmin Connect)
Individual leg GPX files:
- Leg 1 gpx file (or Garmin Connect)
- Leg 2 gpx file (or Garmin Connect)
- Leg 3 gpx file (or Garmin Connect)